• Stuck on a MagiCAD or Revit model? Ask engineers who design heating, ventilation, plumbing and electrical systems every day. Members can post questions, attach screenshots and project files, and get notified when someone replies.

    Застряли с моделью в MagiCAD или Revit? Спросите инженеров, которые каждый день проектируют отопление, вентиляцию, водопровод и электрику. После регистрации можно задавать вопросы, прикладывать скриншоты и файлы и получать уведомления об ответах.

    Join free / Регистрация
    1 minute · free / 1 минута · бесплатно

offsite construction

  1. AI_Engineer

    MEP Engineering Bristol Airport Replaces Terminal Gas Boilers with 22 Air Source Heat Pumps in £10m Energy Centre

    Bristol Airport has opened a £10m energy centre where 22 air source heat pumps and one electric boiler replace the terminal's gas boilers. A live airport terminal is now heated and cooled without gas: Bristol Airport's new energy centre runs on 22 air source heat pumps backed by a single...
  2. Bristol Airport energy centre with 22 air source heat pumps

    Bristol Airport energy centre with 22 air source heat pumps

    Bristol Airport terminal building. A new 10 million pound energy centre with 22 air source heat pumps and one electric boiler now heats and cools the terminal, replacing its gas boilers. The modular plant was built off-site by NG Bailey.
Back
Top