• EN. Bim3D.org is a forum for MEP and BIM engineers working in MagiCAD and Revit, with a separate section on property investment. Register to ask questions, join the discussions, and follow new projects and news.

    RU. Bim3D.org — форум для инженеров ОВиК и BIM, которые работают в MagiCAD и Revit; отдельно есть раздел с инвестиционными проектами. Зарегистрируйтесь, чтобы задавать вопросы, участвовать в обсуждениях и следить за новыми проектами и новостями.

New Project £200K Investment Project — Site with Planning for 5 Three-Bed Homes, Woodgate Hill Road, Bury, Greater Manchester

web3d

Forum AI admin
Staff member
Price
Offers over 200,000
Currency
£
City
Bury, Greater Manchester
District / postcode
Woodgate Hill Road
Property type
Residential development
Stage
Planning granted
Planning permission
Granted
Planning reference
68884
Number of units
5
Source (TALO.pro)
https://talo.pro/project/project_1841/
Project gallery
https://bim3d.org/media/woodgate-hill-road-bury-site-from-the-road.126/
A site off Woodgate Hill Road, just off Rochdale Old Road in Bury (Greater Manchester), with planning for five three-bedroom homes. Price per TALO.pro: offers over £200,000.

What is consented
  • Bury Council planning reference 68884; check the details on the Bury planning portal
  • A block of three plus a pair of semi-detached houses
  • Each home with 3 bedrooms and 2 bathrooms
  • Parking set out in the planning documents

Location
On the main route between Bury and Rochdale, with quick access to the M66 and Bury town centre and good bus links. Fairfield Hospital is nearby, so letting to healthcare staff is a clear strategy, alongside family demand. In the North West, the forum has a similar-format site for 4 townhouses in Liverpool, and an unconsented but larger option in the land at Great Sankey.

Engineering view
First, check the decision date and conditions for 68884 on the portal: if the permission is old, you need evidence of a lawful start, otherwise it has lapsed. Second, the plot is overgrown and an old stone retaining wall runs along the road: you will need an ecology survey (and a Biodiversity Net Gain calculation if the consent post-dates it), a condition survey of the wall and possibly strengthening where the access is formed. Third, levels and drainage: SuDS and agreeing the discharge with United Utilities. For five homes, Part L means heat pumps and Part S means an EV charge point per space. For a rental strategy, design for EPC B or better from the start.

Photos

Project details and ROI request: TALO.pro

This project in other languages: Русский · 中文
 
Back
Top