- Price
- 20,000,000
- Currency
- £
- City
- Paddington, London
- District / postcode
- 179 Harrow Road, W2 6NB
- Property type
- Office / commercial
- Stage
- Completed
- Area, m²
- 4326
- Area, sq ft
- 46565
- Source (TALO.pro)
- https://talo.pro/project/project_1184/
The Battleship Building at 179 Harrow Road, Paddington, London W2 6NB is a Grade II* listed office building: a 1969 British Rail maintenance depot that AHMM converted into offices in 2000, and the former head office of the Virgin Group. The space offered totals 46,565 sq ft (4,326 sq m). Price per TALO.pro: £20,000,000, which the listing puts at £429.51 per sq ft. Tenure and EPC rating are not stated in the listing.
What is on offer
Location
The building sits on Harrow Road right next to Paddington Central, about 0.2 miles from Paddington station (National Rail, Heathrow Express, Elizabeth line and the Circle, District, Bakerloo and Hammersmith & City lines). Warwick Avenue is about 0.2 miles away and Royal Oak about 0.3 miles, with Little Venice and the Grand Union Canal just to the north. For context on pricing, the forum already has the Metro Building at Hammersmith Broadway, a multi-let office in the same £20M band, and the vacant 3 Harbour Exchange Square in Docklands, where the story is conversion rather than continued office use.
Engineering view
The first thing I would keep in mind is the Grade II* listing. Almost any meaningful M&E change, from new risers and roof plant to replacing the façade glazing or adding solar on the roof, will need listed building consent, and the conservation officer will care about how ductwork and services are routed through the exposed depot structure. That makes upgrades slower and more expensive than in an ordinary 2000s office.
The building services themselves date largely from the 2000 conversion, so the air-conditioning is now about 25 years old. I would ask for the plant inventory and the maintenance logs, check which refrigerant the systems use, and price a replacement with heat-pump VRF or a four-pipe system, since that is probably where the first big capital spend sits. The EPC is not given in the listing, and with MEES rules for let offices tightening, this needs to be confirmed early: in a listed building the usual fixes like external insulation are often not allowed, so the route is mostly through plant, controls and LED lighting.
Because the podium office can operate on its own, I would look at how fire alarm zones, smoke control in the interconnecting staircases, metering and access control are split between the parts of the building, plus lift condition, the electrical supply capacity and the latest EICR. The 5th and 6th floor ancillary areas and the roof terrace seen in the photos are also worth a look for waterproofing and drainage, which on a converted industrial roof is a common source of leaks.
Photos
Project details and ROI request: TALO.pro
This project in other languages: Русский · 中文
What is on offer
- 46,565 sq ft (4,326 sq m) of office space
- 3rd and 4th floors of the main building, with ancillary areas on the 5th and 6th floors
- A self-contained office over ground and first floors in the podium, with interconnecting staircases
- Wrap-around windows, air-conditioning, kitchens and a reception area; can be run as self-contained space
- Grade II* listed; 1969 depot converted by AHMM in 2000
- Use Class B1 office use as quoted in the listing; limited on-site car parking
- Business rates and service charges apply
Location
The building sits on Harrow Road right next to Paddington Central, about 0.2 miles from Paddington station (National Rail, Heathrow Express, Elizabeth line and the Circle, District, Bakerloo and Hammersmith & City lines). Warwick Avenue is about 0.2 miles away and Royal Oak about 0.3 miles, with Little Venice and the Grand Union Canal just to the north. For context on pricing, the forum already has the Metro Building at Hammersmith Broadway, a multi-let office in the same £20M band, and the vacant 3 Harbour Exchange Square in Docklands, where the story is conversion rather than continued office use.
Engineering view
The first thing I would keep in mind is the Grade II* listing. Almost any meaningful M&E change, from new risers and roof plant to replacing the façade glazing or adding solar on the roof, will need listed building consent, and the conservation officer will care about how ductwork and services are routed through the exposed depot structure. That makes upgrades slower and more expensive than in an ordinary 2000s office.
The building services themselves date largely from the 2000 conversion, so the air-conditioning is now about 25 years old. I would ask for the plant inventory and the maintenance logs, check which refrigerant the systems use, and price a replacement with heat-pump VRF or a four-pipe system, since that is probably where the first big capital spend sits. The EPC is not given in the listing, and with MEES rules for let offices tightening, this needs to be confirmed early: in a listed building the usual fixes like external insulation are often not allowed, so the route is mostly through plant, controls and LED lighting.
Because the podium office can operate on its own, I would look at how fire alarm zones, smoke control in the interconnecting staircases, metering and access control are split between the parts of the building, plus lift condition, the electrical supply capacity and the latest EICR. The 5th and 6th floor ancillary areas and the roof terrace seen in the photos are also worth a look for waterproofing and drainage, which on a converted industrial roof is a common source of leaks.
Photos
Battleship Building, 179 Harrow Road, Paddington W2 - exterior
Exterior of the Grade II* listed Battleship Building at 179 Harrow Road, Paddington, London W2...
Battleship Building, Paddington W2 - open-plan office floor
Open-plan office floor in the Battleship Building, Paddington, with wrap-around windows and...
Battleship Building, Paddington W2 - roof terrace
Roof terrace of the Battleship Building on Harrow Road, Paddington, London W2, with views over...
Project details and ROI request: TALO.pro
This project in other languages: Русский · 中文