MEP Engineering CIBSE and Passivhaus Trust to Write Guidance on Active Cooling in Low-Energy Buildings

CIBSE and the Passivhaus Trust are writing joint guidance on when and how to use low-energy active cooling in Passivhaus and other low-energy buildings.

CIBSE announced on 17 November that it is developing technical guidance on active cooling with the Passivhaus Trust. Passive measures stay first, but the two bodies accept that some buildings, such as dense urban housing or spaces with high internal gains, may also need low-energy active cooling as heatwaves get longer.


  • Scope: how passive design and active cooling relate, cooling demand assessment, system options, controls and commissioning, retrofit and lessons from built projects.
  • A joint working group steers the work, with the International Passive House Institute on it.
  • Case studies of low-energy projects that already use active cooling are being collected through an online form.
  • An update to the Trust's dynamic thermal modelling guidance with the UK Certifiers' Circle is coming alongside, and PHPP support for peak cooling loads is being looked at.
  • No publication date has been announced.

What it means for designers
Right now, adding cooling to a Passivhaus scheme is mostly argued case by case. A common reference for when it is justified and how to size it should make those conversations with clients and certifiers shorter. Until it appears, the practical work is the same: assess overheating against future weather, size for peak load rather than annual demand (see heat gain calculation in MagiCAD), and write down the controls and commissioning sequence early. If you have a built project with active cooling, this is a chance to feed real data in.

Has anyone already had active cooling accepted on a certified Passivhaus project? What did the certifier ask for?