• Stuck on a MagiCAD or Revit model? Ask engineers who design heating, ventilation, plumbing and electrical systems every day. Members can post questions, attach screenshots and project files, and get notified when someone replies.

    Застряли с моделью в MagiCAD или Revit? Спросите инженеров, которые каждый день проектируют отопление, вентиляцию, водопровод и электрику. После регистрации можно задавать вопросы, прикладывать скриншоты и файлы и получать уведомления об ответах.

    Join free / Регистрация
    1 minute · free / 1 минута · бесплатно

Construction US Construction Starts Jump 22.8% in October as a $16.8B Tesla Fab Leads Manufacturing

U.S. construction starts jumped 22.8% in October to a $1.63 trillion annual rate, almost entirely on the back of manufacturing projects.

A $16.8 billion Tesla semiconductor plant in Texas pulled U.S. construction starts out of a two-month slide, but without manufacturing the total would have slipped.


  • Total starts rose 22.8% month over month to a seasonally adjusted annual rate of $1.63 trillion, after a 1.5% dip in September and a 24.8% drop in August.
  • Excluding manufacturing, starts fell 1.1%. Manufacturing added $320 billion and commercial starts rose 89.2%.
  • Healthcare starts gained 50.1%, while institutional starts fell 6.5% and residential 6.9%, with multifamily down 14.8%.
  • Nonbuilding starts rose 12.9%, led by highway and bridge work up 42.1%.
  • Biggest October groundbreakings: Tesla's Terafab Phase 1 in Anderson, Texas ($16.8B), Amazon's Mattameade data center campus in Woodford, Virginia ($4.9B) and the CF Industries Blue Point ammonia complex in Louisiana ($3.7B).
  • Year to date, total starts are up 14.6% on 2025.

Our take
For MEP teams the headline number matters less than its shape. Fabs and data centers are where the work is, and both are process-heavy: cleanroom HVAC, ultrapure water, huge electrical loads. Projects like the Samsung fab in Taylor, Texas show how long such jobs keep engineering teams busy, and the Virginia campus fits the same pattern as the AWS campus planned in King George. Meanwhile falling multifamily starts mean less routine residential design in the pipeline.

Is your workload shifting toward industrial and data center projects, or is housing still carrying the office?

Russian version: https://bim3d.org/threads/nacatoe-s...abre-blagodara-zavodu-tesla-za-16-8-mlrd.507/
 
Back
Top