• Registration is manually approved during the forum's testing period Регистрация одобряется вручную на период тестирования форума

Office / Commercial £12.5M Investment Project — The Connection Office Building, 198 High Holborn, London

web3d

Administrator
Staff member
Price
12,500,000
Currency
£
City
London
District / postcode
198 High Holborn, WC1V 7BD
Property type
Office / commercial
Stage
Completed
Area, m²
2182.7
Area, sq ft
23494
Tenure
Leasehold
Source (TALO.pro)
https://talo.pro/project/project_2703/
Project gallery
https://bim3d.org/media/the-connection-entrance-198-high-holborn-london.55/
The Connection, 198 High Holborn, London WC1V 7BD — 23,494 sq ft (2,182.7 sq m) of net lettable offices, priced at £12,500,000, or £510.33 per sq ft.

The building
  • Offices over ground and five upper floors, open-plan floorplates with good natural light
  • Self-contained landscaped approach via Dragon Yard from High Holborn, plus a rear entrance on Stukeley Street
  • Cat A finish, with the first floor fully fitted
  • Two 8-person lifts and a glazed central core
  • Tenure: virtual freehold — 999-year lease (about 973 years left) at a peppercorn rent

Occupancy
Sold with a short-term leaseback of parts of the 4th and 5th floors; the project page gives full vacant possession by Q2 2026. The rest is available straight away. Works for owner occupation, sub-division or, with consent, alternative uses.

Location
Where five Midtown sub-markets meet: Covent Garden, Holborn, Soho, Fitzrovia and Bloomsbury. Tottenham Court Road (Elizabeth line) is an 8-minute walk. The Royal Opera House, British Museum, Seven Dials and Bloomsbury's universities and hospitals are all close by.

An engineer's view
Most of the value-add is building services work: the vendor points to a refurbishment programme with bigger end-of-journey facilities (cycle store, showers, lockers) and a better arrival experience. For a Cat A building with a glazed core I would commission an M&E survey before exchange — plant age, the EPC rating (not stated on the page) and spare electrical capacity — because that decides whether the asset meets MEES and what Midtown occupiers now expect. No parking.

Photos

Project details and ROI request: TALO.pro

This project in other languages: Русский · 中文
 
Back
Top