• Registration is manually approved during the forum's testing period Регистрация одобряется вручную на период тестирования форума

Residential Development £325K GDV Investment Project — New 2-Bed Detached House, Point Clear Bay, St Osyth, Essex

web3d

Administrator
Staff member
Price
POA (Price on application)
Currency
£
City
St Osyth (Point Clear Bay), Essex
District / postcode
Point Clear Bay, CO16
Property type
Residential development
Stage
Planning granted
Planning permission
Granted
Number of units
1
GDV (gross development value)
£325,000
Source (TALO.pro)
https://talo.pro/project/project_646/
Project gallery
https://bim3d.org/media/point-clear-bay-st-osyth-new-build-house-plot-location-plan.31/
Demolition of an existing house and a new-build detached 2-bedroom home in Point Clear Bay, St Osyth, Essex. Expected gross development value (GDV): £325,000.

The site
An elevated plot in Point Clear Bay, a coastal spot in Tendring district. The scheme is a full cycle: buy the plot with consent, clear the existing structure, build a new detached house (2 bed, 1 bath), then sell or let it.

  • Plot: approx. 50 ft wide × 113 ft deep, around 0.1 acre
  • Three plots under two titles, all included
  • Views over the salt marshes, Brightlingsea Creek and harbour towards Mersea Island
  • First time on the market since 1958

Planning
A Certificate of Lawful Development was issued in 2021, confirming a lawful start under the permission to demolish the house and build a new detached dwelling. Papers are on the Tendring District Council planning portal; the reference is available on request.

Location
  • St Osyth village — approx. 2.5 miles (4 km)
  • Sandy beach and the Brightlingsea ferry — 10 minutes' walk along the promenade
  • Colchester — 14 miles, Ipswich — about 30 miles, London — about 70 miles
  • Buses 6 (Clacton-on-Sea to Point Clear) and C3 (Point Clear to Brightlingsea); nearest rail at Clacton-on-Sea and Colchester

What I would check
It is a single-house build, so the numbers are easy to stress-test. Before committing I would want the land price, a build budget that allows for the exposed coastal position (wind loading, ground conditions, surface water drainage) and the Building Control timeline. TALO.pro prepares the ROI calculation on request.

Photos and drawings

Project details and ROI request: TALO.pro

This project in other languages: Русский · 中文
 
Back
Top