Residential Development £32M GDV Investment Project — 98–122 Home Residential Scheme, Little Clacton (Weeley), Essex

web3d

Administrator
Staff member
Price
POA (Price on application)
Currency
£
City
Little Clacton / Weeley, Essex
District / postcode
The Street, CO16
Property type
Residential development
Stage
Planning granted
Planning permission
Granted
Number of units
98
GDV (gross development value)
£32,000,000
Source (TALO.pro)
https://talo.pro/project/project_718/
Project gallery
https://bim3d.org/media/site-layout-98-home-scheme-little-clacton-weeley-essex.35/
A consented scheme for 98 houses and bungalows on The Street, Weeley / Little Clacton, Essex, with a pre-application in for up to 122 units. GDV per TALO.pro: £32 million.

Planning
  • Full planning permission from Tendring District Council for 98 homes — houses and bungalows with 3, 4 and 5 bedrooms
  • Pre-app submitted to increase to 122 units by swapping some larger homes for 2- and 3-bed houses
  • S106 terms described by the vendor as favourable; reference and S106 details on request

Site and surroundings
Semi-rural, surrounded by open fields, not far from the coast. Weeley has the basics — a Co-op, bakery, garden centre, several pubs, a village hall and St Andrew's CofE Primary School. Everything else is in Clacton-on-Sea and Colchester.

Distances and transport
  • Clacton-on-Sea — about 4 miles, Frinton-on-Sea — 7 miles
  • Colchester — 10–12 miles, Ipswich — 20 miles, London — 60–70 miles
  • A133 and B1441 roads
  • Weeley station: Colchester ~25 min, Chelmsford ~1 hr, London ~90 min; Thorpe-le-Soken station is also nearby

My take
This is a developer or fund-sized deal rather than a private one. The key point is that planning risk on 98 units is already gone. If the 122-unit pre-app goes through, density goes up and the mix shifts towards 2–3 bed houses, which tend to sell faster. On due diligence I would focus on the S106 package (affordable share and contributions), utilities and connection costs — a real budget line at this scale — and the sales phasing.